
|
Civil Engineering: |
 |
|

|
|
|
|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

|
Rail |
|
|

|
|
|
|

|
Ground Engineering: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
 |
Rail
We have carried out a number of Rail related schemes both directly for Network Rail, for Area Framework Contractors such as Birse Rail and for Light Rail projects. The company is fully Link-up accredited for a range of product groups (listed below) and holds a Principal Contractors Licence (formerly Contractors Assurance Case). (View Principal Contractors License Certificate).
|
|
Schemes carried out include:
- Embankment Stabilisation involving a range of techniques including; soil nailing, placement of geotextiles and geogrids, nailed gabions, toe drainage, stone fill to improve toe stability, grouting of rabbit burrows.
- Drainage & Infrastructure to main rail freight centres including Crewe & Bescot. Work has involved accesses and hardstandings in concrete and tarmac, refuelling areas, foul and storm drainage, interceptors, culverted watercourses, earthworks and environmental mitigation works such as creation of linked pond habitats for translocated freshwater crayfish.
- Geotechnical Work including; site investigations, mine workings stabilisation under bridge abutments, embankments and main rail lines, bridge tying, cintec anchors and rotary cased piles.
|
|
Link-up product groups: (CAC approved groups in bold);
Core Module
Major Civil Engineering > £3.5m
Minor Civil Engineering < £3.5m
Specialist Services—Thrustboring & pipejacking
Land Clearance Specialist Contractors
Geotechnical Engineering Contractors
Drainage & Culverts (Linside Work)
Drain Clearance (Not Lineside)
Contaminated Land Reclamation & Disposal |
Civil Engineering—Other
Roadways, Footways & Car Parks
Landscaping
Earthworks—Piling (Excluding Sheet Piling)
Earthworks Ground anchors
Earthworks Embankment & Cutting
Lineside Structures Brick & Concrete
Specialist Drilling Engineers
Tunnelling Contractors |
|
 |
|